“Each time they add a velocity to the transmission, that interprets into them buying much more machine instruments and should require setting up a model new plant to make these transmissions,” he mentioned. However, he confused that even after a contract is awarded, there’s often a cost address improvement rate written in requiring incremental year-over-year reductions. “They determine once you get out of the engineering stage and into manufacturing, you should be ready to get better instruments, better software materials, better coatings, and sooner machines.
…